greatwall

Shanghai baosteel 1.5 million t/a epc slag powder line

News Date:2017-06-08 14:30:47

A grand ceremony is held in Ningbo on April 27, 2017. The EPC (Phase I) production line of 1.5 million t/a slag composite powder of Shanghai Baosteel Ningbo Ziheng, which is contracted by CHAENG (Xinxiang Great Wall machinery Co., LTD.,) has put into production successfully.

Significance of the project

In order to study the recycling of steel slag, GGBS (Ground Granulated Blast Furnace Slag) and waste slag from steel mill and solve the problem of steel mills zero emissions, Shanghai baosteel build this demonstration project of comprehensive utilization of steel slag composite powder in domestic. This plays a leading role for the comprehensive utilization of steel slag , solves the secondary effects on the environment of steel factory solid waste, and improves the efficiency of the enterprise

site1.jpg

Operation Status

It is reported that the first phase of the production line will use theGRMS46.41 slag vertical roller mill & φ3.2 x 13m steel slag ball mill, manufactured by CHAENG, as the project's main grinding process equipment, which has high production efficiency and obvious effects in environmental protection and energy saving.

status1.jpg

Before the deadline, according to the data test report send from Shanghai Baosteel, the production of GRMS46.41 reached 110t/h, with the Blaine test of 454m2/kg. The production of steel slag ball mill is 40 t/h, with the Blaine test of 500 m2/kg. It runs well, each index is normal, and fully meet the customer's production requirements.

As Chairman Wang Jizhong said, "CHAENG gives the users the quality, credibility and trust." Shanghai baosteel officials agree with this and express that they will continue to car

Back to Top