greatwall

Guangxi 400,000 tons lime production line installation is coming to an end

News Date:2016-07-20 14:30:00

Recently, Guangxi Hua Yan 400,000 tons of active lime production line installation is also coming to an end.

Cooperation time: the end of 2014

Cooperation Project: Guangxi Hua Yan 400,000 tons of active lime production line Contractor: Xinxiang City, Chaeng

Device Configuration: 4 × 60m rotary kiln ,cooler, coal mill

Lime kiln Delivery time: October 2015

Starting date: 2016 .10.1

2.jpg

Turnkey lime production line Advantage: This project mainly uses equipment manufactured by Chaeng new environmentally friendly φ4.0 × 60m lime kiln, which has an absolute advantage in the active lime, ignition loss, low energy consumption, environmental protection and other areas:

1. The degree of activity of lime shaft rotary kiln production is higher than the average high 30ml, activity of up to 400ml, or even higher;

2. uniform product quality, raw burnt burn rate, students burnt burn rate<8%;

3. Chaeng lime kiln belonging to the open firing, high-tech production process, relatively low 40% than the old lime kiln energy consumption, waste and the use of blast furnace gas as a fuel and other, more environmentally friendly.

4. The ROTARY KILN structure is simple, airflow, the gas can be discharged in the sulfur smoke, fuel sulfur easy attachment, and thus lower product sulfur content, desulfurization efficiency up to 85%;

5. High degree of automation, using DCS remote control system, the entire line 2-3 person operations, reduce labor costs.

Back to Top