greatwall

Design of clinker grinding production line and main process

News Date:2021-07-27 13:54:09

Design of clinker grinding production line. After the gypsum, rotary kiln clinker and limestone are measured by belt weigher, the prepared mixture is transported to the elevator by belt conveyor and sent to the stable flow weigher heavy bin. In this process, the material is removed from the magnetic metal by the iron remover, then mixed and fed to one of the vertical roller mills. The enters the stable flow weigher heavy bin, and then mixed with the mixture The fine materials less than 2.5mm will enter vertical cement mill for grinding.

0f3c585a52dd9337d17c204e7e27cc60.jpg

The grinding materials and metered fly ash will enter the mixture elevator through the grinding tail conveyor chute, and then enter the K-type internal circulation powder concentrator through the selected powder conveyor chute. The coarse powder of the powder concentrator will be returned to the mill again. The fine powder will enter the finished product elevator through the air conveyor chute and enter the finished product warehouse. The dust containing gas from the mill is p

Back to Top